Fig. 01 — Full setup
bench · 55W panel · 10A PWM · 12V 26Ah
Time07:00
Battery12.52V
Panel → Load0.0 / 0.0A
StatusOFF
Start: the fuse is out. Connect the battery first, then insert the fuse.
Time of day
Weather · speed
Low-voltage cutoff (LVD)
Hand-drawn wobble
Battery colour
In this figure
The panel turns sunlight into current, the controller makes it safe for the battery, the battery stores it, and the load (fan, phone, router) runs from the controller's LOAD and USB outputs. Follow the same order as the real setup, and try mistakes to see what happens.
- Battery (fuse out)
- Insert fuse → LCD shows 12V
- Settings: SLD, LVD 12.0V
- Panel
- Load
To disconnect, reverse it: Load → Panel → Battery.
Selected part
Nothing selected
Click any part or label in the figure.Parts in this setup
Serial monitor (event log)
Check yourself
Practice task: first-day checklist
Do all of these in the figure. Each step ticks itself. Measurements use the floating multimeter (press M).